Short answer: Canadian plants that post 2026 lists deliver from 1 m³, but charge a small-load fee of $50 to $400 per truck until the order reaches about 4 to 7 m³. One delivered cubic metre costs $534.50–$706 before tax on the Ontario and Quebec lists, and $547 in Edmonton. For less than that, a trailer pickup or mix-on-site truck can cost less, and under about 1 m³ you can also mix 30 kg bags (about 72 per m³).
Small-load fees by plant (2026)
| Order | CBM (ON) | Viola (GTA) | Dufferin (ON) | Bernier (QC) |
|---|---|---|---|---|
| 1 m³ | $400 | $250 | $400 | $265 |
| 2 m³ | $300 | $250 | $400 | $265 |
| 3 m³ | $300 | $200 | $400 | $215 |
| 4 m³ | $175 | $150 | $250 | $190 |
| 5 m³ | None | $100 | $150 | $190 |
| 6 m³ | None | $50 | None | None |
| 7 m³ and up | None | None | None | None |
CBM’s GTA and Eastern Region lists (Jan 15, 2026) use the same brackets and set a 1 m³ minimum load. Viola’s and Dufferin’s 2026 lists say a 3 m³ minimum is needed to guarantee quality, though both list fees below it, so ask what they will pour and guarantee. With the concrete itself, the totals are on the Canada ready-mix price guide.
Options below a full truck
- Small batch with a flat delivery fee. Mini Batch Concrete (Edmonton) prices loads from 0.2 m³ to 1.0 m³ and delivers 1 to 12 m³ for a flat $190 within Edmonton, Sherwood Park, and St. Albert, with no fuel or environmental surcharges and no charge for leftover concrete (spring 2026). Half a cubic metre of 32 MPa driveway mix is listed at $313. It also rents 1 m³ trailers at $35 per hour.
- Trailer pickup. Vancouver Ready Mix’s U-Cart has no minimum order. You tow the trailer from its Langley plant, pour, clean it, and return it within 3 hours. Price is by quote.
- Mix-on-site (volumetric) trucks. These carry dry materials and mix only what you pour, so you pay for what you use. A Calgary volumetric supplier, Omega 2000 (Jun 3, 2026), says volumetric usually wins under about 3–4 m³ and on rural sites, and drum trucks win on single pours of about 8 m³ and up. That is a seller’s view, so get both quotes.
- Bags. A 30 kg (66 lb) bag yields about 0.014 m³ (Sakrete Canada), so 1 m³ is 72 bags and 0.5 m³ is 36 before waste. Fence-post holes and small pads are usually bag jobs.
Bags or a truck for about 1 m³?
One delivered cubic metre of 32 MPa costs $534.50 (Viola) to $706 (Dufferin) on the Ontario and Quebec lists, and $547 from Mini Batch in Edmonton, before tax. Divided by 72 bags, that is about $7.40 to $9.80 per bag. If 30 kg bags cost less than that where you shop, bags cost less in materials, but you mix 72 of them by hand, and large slabs mixed in batches can end up with joints between batches. The metric calculator counts 30 kg bags and lets you enter your shelf price.
How to keep the fee down
- Check the next bracket. At CBM, 4 m³ pays $175 and just over 4 m³ pays nothing. A quarter metre more of 32 MPa is about $70. At Dufferin, going from 5 to 5.25 m³ adds about $77 of concrete and drops the $150 fee.
- Combine pours. A walkway and a pad poured the same day share one truck and one fee.
- Order the right volume once. A second truck for the last half metre pays a second small-load fee. Add 4–10% for waste.
- Pour on a weekday, during the day. CBM adds $30/m³ on Saturdays and after 5 pm; Dufferin adds $40/m³ after 5 pm.
- Watch the season. From November to April the lists add $15–$22/m³ for winter handling.
Related
Ready-mix prices in Canada · Concrete calculator (metric) · US delivery minimums · Fence-post holes · Sources
FAQ
What is the smallest concrete delivery I can get in Canada?
On posted 2026 lists, CBM (Ontario) and Carrière Bernier (Quebec) start at 1 m³. Mini Batch Concrete in Edmonton prices loads from 0.2 m³. Vancouver Ready Mix’s U-Cart trailer pickup has no minimum order.
How much is a small-load fee for concrete in Canada?
$50 to $400 per truck on the five 2026 lists we checked. The highest fees are for 1 to 3 m³: $400 at CBM for 1 m³ and at Dufferin for 1–3 m³, $300 at CBM for 1.2–3 m³, $265 at Bernier for 1–2 m³, and $250 at Viola under 3 m³.
How many 30 kg bags of concrete make a cubic metre?
About 72. Sakrete Canada lists a yield of about 0.014 m³ per 30 kg (66 lb) bag, so 1 m³ takes 71.4 bags, rounded up to 72, before waste.
Is it cheaper to use bags or a truck for 1 cubic metre?
It depends on your bag price. One delivered cubic metre of 32 MPa costs $534.50–$706 before tax on the 2026 lists we checked ($547 in Edmonton). Divide by 72 bags: if 30 kg bags cost less than about $7.40–$9.80 each where you shop, bags cost less in materials. You still mix 72 bags by hand.
Should I order a little extra to avoid the small-load fee?
Sometimes. At CBM, a 4 m³ order pays $175, while just over 4 m³ pays nothing; the extra quarter metre costs about $70. At Dufferin, 5 m³ pays $150, and 5.25 m³ adds about $77 of concrete with no fee. Check your plant’s brackets.