How much concrete do you need?

Cubic yards, bag counts, and a cited 2026 ready-mix range.

Project details

Typical patio 4 in; driveways often 4–6 in.

Default 10%. NRMCA cites 4–10%; HomeGuide, 5–10%.

Enter the dimensions to see yards, bags, and a sourced cost range.

How this is calculated

How to use this estimate

Pick the shape that matches the pour. Thickness is in inches; length and width are in feet. Add identical pieces with the quantity field. The waste field (default 10%) follows the overlap of NRMCA CIP 31 (about 4–10% more than plan volume) and HomeGuide’s January 6, 2026 5–10% waste-and-spills note.

Safety: Fresh concrete can cause severe chemical burns to skin and eyes. Keep it off your skin, wear protective boots, gloves, and eye protection, wash skin promptly, and get medical help if it reaches the eyes (NRMCA CIP 31).

Worked example

A 10 × 10 ft slab, 4 inches thick, is 33.33 ft³, or 1.23 cubic yards before waste. With 10% extra you would plan on 1.36 yd³. That is 62 of the 80 lb bags, or 82 of the 60 lb bags, after rounding up (36.67 ft³ ÷ 0.60 and ÷ 0.45). Step-by-step: how much concrete for a 10×10 slab. A 10 × 12 patio at the same thickness is 1.48 yd³ before waste. See the 10×12 patio guide.

What the $110–$195 range is, and is not

It is the span of three 2026 national guides for concrete and typical delivery, not labor or finishing. Angi, HomeGuide, and Concrete Network do not agree with each other; we do not invent a mid-point. Short-load and mileage add-ons sit outside that span. The full table is on the concrete cost per yard page and in methodology.

FAQ

How many 80 lb bags are in a cubic yard?

The QUIKRETE Concrete Mix (No. 1101) data sheet lists a yield of about 0.60 ft³ per 80 lb bag and 0.45 ft³ per 60 lb bag. That is 45 of the 80 lb bags, or 60 of the 60 lb bags, per cubic yard before waste. We always round bag counts up.

Should I add extra for waste?

NRMCA CIP 31 recommends ordering about 4% to 10% more than the plan-volume calculation. HomeGuide (Jan 6, 2026) says to add 5% to 10% for waste and spills. The default in this calculator is 10%, and you can set 0–20%.

How much does a cubic yard of concrete cost?

National guides published in 2026 do not agree. Angi (Sep 10, 2026) lists about $110–$150/yd³, HomeGuide (Jan 6, 2026) lists $119–$147 with delivery up to 20 miles, and Concrete Network (Jul 14, 2026) cites $160–$195 or more, with a 2025 average of $179.95. We show $110–$195/yd³ as a planning range and list each source. This is not a quote.

When should I use bags instead of a truck?

Bags are often more practical under about 1 cubic yard. Larger pours are usually cheaper per yard as ready-mix, but orders under about 10 cubic yards commonly incur a short-load fee. Angi discusses both points. Confirm the plant’s minimum before you order.

Is wet concrete dangerous?

Yes. Fresh concrete can burn skin and eyes. Follow the safety note on this page and the caution in NRMCA CIP 31.

Related

Cost per yard · Driveway cost · Patio cost · Bags in a yard · Bags vs. ready-mix · 10×10 slab · 10×12 patio · Fence-post holes · Sources

Get free quotes (not live yet)

This form is a placeholder and does not collect or send anything. A local contractor quote is the only real price.

TODO: Connect a contractor lead program (Home Depot Installation, Lowe’s, or a lead network) before enabling this form.